New tunnelling achievements reached in driving big Ontario hydro tubes
Twin tunnels, 51 ft diam, each 5.4 mi long driven under Niagara Falls, Ont, for Hydro-Electric Commission of Ontario's new Sir Adam Beck No 2 generating project; finished diam 45 ft with minimum concrete lining 28 in; ventilation by four fans which can put 65,000 cfm into heading; drilling pattern for bench excavation is 4×4 ft grid. (p 64-6, 68, 72-4, 76-7, 80-1)
New tunnelling achievements reached in driving big Ontario hydro tubes
Twin tunnels, 51 ft diam, each 5.4 mi long driven under Niagara Falls, Ont, for Hydro-Electric Commission of Ontario's new Sir Adam Beck No 2 generating project; finished diam 45 ft with minimum concrete lining 28 in; ventilation by four fans which can put 65,000 cfm into heading; drilling pattern for bench excavation is 4×4 ft grid. (p 64-6, 68, 72-4, 76-7, 80-1)
New tunnelling achievements reached in driving big Ontario hydro tubes
Construction Methods Equipment
Richardson, H.W. (author)
1953
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Peak construction reached on New Zealand's largest hydro-electric project
Engineering Index Backfile | 1961
|Ontario hydro research quarterly
TIBKAT | 15.1963 - 29.1977
Research review / Ontario Hydro
TIBKAT | 1.1980 - 8.1993; damit Ersch. eingest.
|TIBKAT | 4.1952 - 14.1962
SMALL HYDRO - Small hydro in China: Achievements and prospects
Online Contents | 2004
|