A platform for research: civil engineering, architecture and urbanism
Erection of three warehouses for Navy at Great Lakes, Ill; each is 200×600 ft, with canopied loading platforms; max height 25 ft; fast erection was possible by precasting structural members and prefabricating reinforcement so that it could be dropped into forms; foundation consisted of precast 6×20 ft walls between cast-in-place spread footings; total cost $5.85 per sq ft.
Erection of three warehouses for Navy at Great Lakes, Ill; each is 200×600 ft, with canopied loading platforms; max height 25 ft; fast erection was possible by precasting structural members and prefabricating reinforcement so that it could be dropped into forms; foundation consisted of precast 6×20 ft walls between cast-in-place spread footings; total cost $5.85 per sq ft.
Precast warehouses go up fast and cheaply
Construction Methods Equipment
Perez, H.T. (author)
1953
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1946
Engineering Index Backfile | 1946
Engineering Index Backfile | 1939
|British Library Conference Proceedings | 2002
|Gravel roads cheaply surfaced with asphalt
Engineering Index Backfile | 1926