A platform for research: civil engineering, architecture and urbanism
San Francisco's broadway tunnel completed
Tunnel through Russian Hill provides low level traffic artery from downtown section to Golden Gate Bridge; project including twin tubes is 1365 ft long, besides approach streets, approach cuts and ventilation buildings; soft ground required thick reinforced concrete lining in tunnels as well as heavy retaining walls in approach cuts; total project cost amounted to $7,522,622.
San Francisco's broadway tunnel completed
Tunnel through Russian Hill provides low level traffic artery from downtown section to Golden Gate Bridge; project including twin tubes is 1365 ft long, besides approach streets, approach cuts and ventilation buildings; soft ground required thick reinforced concrete lining in tunnels as well as heavy retaining walls in approach cuts; total project cost amounted to $7,522,622.
San Francisco's broadway tunnel completed
Civ Eng (NY)
Wadsworth, R.G. (author)
1953
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1899
Low-level broadway highway tunnel
Engineering Index Backfile | 1933
Geology of Broadway Tunnel, Berkeley Hills, California
Engineering Index Backfile | 1950
|NATM/SEM Analyses for San Francisco's Transbay Extension Tunnel
British Library Conference Proceedings | 2008
|Engineering Index Backfile | 1938