A platform for research: civil engineering, architecture and urbanism
Round-the-year cleaning prevents clogged sewers in Dayton, Ohio
Dayton has 240 mi of storm sewers from 12 to 108 in. in diam and 410 mi of sanitary sewers from 8 to 108 in.; cleaning with buckets and flexible rods takes place once every two yr; cleaning operation described; regular maintenance results in fewer stoppages.
Round-the-year cleaning prevents clogged sewers in Dayton, Ohio
Dayton has 240 mi of storm sewers from 12 to 108 in. in diam and 410 mi of sanitary sewers from 8 to 108 in.; cleaning with buckets and flexible rods takes place once every two yr; cleaning operation described; regular maintenance results in fewer stoppages.
Round-the-year cleaning prevents clogged sewers in Dayton, Ohio
Am City
Macy, W.E. (author)
American City ; 68
1953
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Separate system of sewers as proposed for the City of Dayton, Ohio
Engineering Index Backfile | 1891
|Best Institutional/College University of Dayton, Dayton, Ohio
British Library Online Contents | 2006
Engineering Index Backfile | 1893
Reinforced concrete car house, Dayton, Ohio
Engineering Index Backfile | 1910
|Storm-relief sewer details. Dayton, Ohio
Engineering Index Backfile | 1931
|