A platform for research: civil engineering, architecture and urbanism
Nearly all sewage must be pumped for discharge to bay or river due to high water table; at present 200 mi of sewers serve 55% of all year population and sewage is discharged without treatment into Biscayne Bay, Miami River, and Little river; based on survey in 1949 it was decided to build 47 mgd treatment plant and to discharge purified effluent into ocean one mi from shore; outfall was designed for 153 mgd equal to flow anticipated from 1980 winter population.
Nearly all sewage must be pumped for discharge to bay or river due to high water table; at present 200 mi of sewers serve 55% of all year population and sewage is discharged without treatment into Biscayne Bay, Miami River, and Little river; based on survey in 1949 it was decided to build 47 mgd treatment plant and to discharge purified effluent into ocean one mi from shore; outfall was designed for 153 mgd equal to flow anticipated from 1980 winter population.
Miami tackles multi-faced pollution problem
Civ Eng (NY)
Chase, E.S. (author)
1953
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Purdue tackles housing problem
Engineering Index Backfile | 1936
Los Angeles tackles sewage problem
Engineering Index Backfile | 1945
Small Community Tackles Tough I/I Problem
British Library Conference Proceedings | 2005
|Permeable pavement tackles stormwater
British Library Online Contents | 2015
Euro project tackles building rehabilitation
British Library Online Contents | 2003