A platform for research: civil engineering, architecture and urbanism
Trencher digs out Texas sand-clay roads
Blow sand and underlying clay mixed in single operation to construct low cost surfaces on raised roadbeds in Mitchell County, Tex; reason for success was that in cutting trench, trenching machine mixed sand with underlying clay and automatically brought stabilized surfacing material to top; 6-man crew built mile of completed road weekly.
Trencher digs out Texas sand-clay roads
Blow sand and underlying clay mixed in single operation to construct low cost surfaces on raised roadbeds in Mitchell County, Tex; reason for success was that in cutting trench, trenching machine mixed sand with underlying clay and automatically brought stabilized surfacing material to top; 6-man crew built mile of completed road weekly.
Trencher digs out Texas sand-clay roads
Better Roads
Better Roads ; 23
1953
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Trencher digs and mixes cutoff materials
Engineering Index Backfile | 1939
|Custom-rigged ladder trencher digs 31 ft deep
Engineering Index Backfile | 1967