A platform for research: civil engineering, architecture and urbanism
Design and construction of backwater reservoirs at Coblenz and Trier, Germany; purpose of regulation was to make Mosel River navigable; illustrated description of weir, lock and flapgate; level difference utilized for hydrolectric power plant equipped with Kaplan turbines both at Coblenz and Trier; generators produce 400 and 4500 kva, respectively.
Design and construction of backwater reservoirs at Coblenz and Trier, Germany; purpose of regulation was to make Mosel River navigable; illustrated description of weir, lock and flapgate; level difference utilized for hydrolectric power plant equipped with Kaplan turbines both at Coblenz and Trier; generators produce 400 and 4500 kva, respectively.
Bau und Planung der Staustufen Koblenz und Trier
Bau und Planung der Staustufen Koblenz und Trier
Franz, K. (author)
Bautechnik ; 29
1952
5 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydraulische Probleme bei der Planung von Staustufen
UB Braunschweig | 1974
|Bundesautobahn Koblenz-Trier-Saarbrücken
UB Braunschweig | 1975
Bundesautobahn Koblenz-Trier-Saarbrücken
TIBKAT | 1975
Automatisierter Betrieb von Staustufen
UB Braunschweig | 2006
|