A platform for research: civil engineering, architecture and urbanism
Reconstruction of "Quai de France", completed in 1952; new structure which involved encroachment of 4.80 m towards basin, has shape of angular frame with counterforts and rests on rock and old quay; work was characterized by method of building caissons in elements and assembling these by prestressing.
Reconstruction of "Quai de France", completed in 1952; new structure which involved encroachment of 4.80 m towards basin, has shape of angular frame with counterforts and rests on rock and old quay; work was characterized by method of building caissons in elements and assembling these by prestressing.
Port of Cherbourg
Dock Harbour Authority
Brosson, P.L. (author)
1953
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1945
Engineering Index Backfile | 1930
|Extensions of Port of Cherbourg
Engineering Index Backfile | 1930
|Development of the port of Cherbourg
Engineering Index Backfile | 1929
The hydraulic rolling bridge of the Port of Cherbourg
Engineering Index Backfile | 1897