Service Pipe Line Co's new Tioga-Mandon line crosses Garrison Dam reservoir, and two rivers in its 154-mi route across North Dakota; dredging of ditch and its depth at different intervals; coating is followed by concrete jacket; throughput capacity is 30,000 bbl per day and can be increased to 100,000 bbl.
Long underwater river crossing constructed on dry land
Service Pipe Line Co's new Tioga-Mandon line crosses Garrison Dam reservoir, and two rivers in its 154-mi route across North Dakota; dredging of ditch and its depth at different intervals; coating is followed by concrete jacket; throughput capacity is 30,000 bbl per day and can be increased to 100,000 bbl.
Long underwater river crossing constructed on dry land
Petroleum Engr
Petroleum Engineer ; 25
1953
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Directionally Drilled Crossing Constructed Under River Levee
Online Contents | 1996
River-crossing underwater pier foundation construction platform operating method
European Patent Office | 2015
|Construction method of land joint of river-crossing channel
European Patent Office | 2024
|European Patent Office | 2024
|An Underwater Crossing of the Noord River the Noord Tunnel in the Netherlands
British Library Online Contents | 1997