A platform for research: civil engineering, architecture and urbanism
New twist in wall construction pays off
60 construction days were saved in building $500,000 laboratory for Sylvania Electric Products Co at Sunnyvale, Calif, by constructing roof first, departing from usual tiltup procedure; wall panels were then poured inside partially completed building structure; how job was done.
New twist in wall construction pays off
60 construction days were saved in building $500,000 laboratory for Sylvania Electric Products Co at Sunnyvale, Calif, by constructing roof first, departing from usual tiltup procedure; wall panels were then poured inside partially completed building structure; how job was done.
New twist in wall construction pays off
Construction Methods Equipment
1953
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
UB Braunschweig | 1974
Who pays for unexpected in construction
Engineering Index Backfile | 1963
La construction prefabriquee dans les pays en developpement
Taylor & Francis Verlag | 1982
|Exceptional job engineering pays off on bridge construction
Engineering Index Backfile | 1960
|