A platform for research: civil engineering, architecture and urbanism
Alcan -- British Columbia power project under construction
Damming of Nechako River, will create reservoir with surface area of 335 sq mi; 16 4-nozzle vertical shaft impulse turbines, each with capacity of 140,000 hp to operate under head of 2590 ft at 327.5 rpm; underground power house excavated in granodiorite; main storage rockfill dam contains 4,000,000 cu yd of embankment; total energy available 1,670,000 hp, delivered at Aluminum Co of Canada (Alcan) smelting plant.
Alcan -- British Columbia power project under construction
Damming of Nechako River, will create reservoir with surface area of 335 sq mi; 16 4-nozzle vertical shaft impulse turbines, each with capacity of 140,000 hp to operate under head of 2590 ft at 327.5 rpm; underground power house excavated in granodiorite; main storage rockfill dam contains 4,000,000 cu yd of embankment; total energy available 1,670,000 hp, delivered at Aluminum Co of Canada (Alcan) smelting plant.
Alcan -- British Columbia power project under construction
Civ Eng (NY)
Huber, W.G. (author)
1952
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Alcan -- British Columbia power project under construction
Engineering Index Backfile | 1953
|Engineering Index Backfile | 1943
Engineering Index Backfile | 1943
|Engineering Index Backfile | 1943
|Engineering Index Backfile | 1943
|