A platform for research: civil engineering, architecture and urbanism
New facilities add 100 mgd to Milwaukee's water supply capacity
New expansion includes 315-mgd intake and 7600 ft of 108-in. reinforced concrete pipe, raw water pumping station with potential capacity of 315 mgd, 18,300 ft of 84-in. raw-water main connecting new pumping station and treatment plant, 15 MM gal of clearwell capacity, and high- and low-service pumping station with 271 mgd connected capacity, and 2.5 MM gal lowservice reservoir.
New facilities add 100 mgd to Milwaukee's water supply capacity
New expansion includes 315-mgd intake and 7600 ft of 108-in. reinforced concrete pipe, raw water pumping station with potential capacity of 315 mgd, 18,300 ft of 84-in. raw-water main connecting new pumping station and treatment plant, 15 MM gal of clearwell capacity, and high- and low-service pumping station with 271 mgd connected capacity, and 2.5 MM gal lowservice reservoir.
New facilities add 100 mgd to Milwaukee's water supply capacity
Civ Eng (NY)
Ihling, H.M. (author) / Proudfit, D.P. (author)
1963
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Chlorophenol Tastes in Milwaukee's Water Supply
Wiley | 1925
|Online Contents | 1996
|Milwaukee's Water Purification Problem
Wiley | 1934
|Milwaukee's special-section sewer
Engineering Index Backfile | 1948
Engineering Index Backfile | 1955
|