A platform for research: civil engineering, architecture and urbanism
Jacking method was chosen to make street under-crossings in Renton, Wash, sewer line project; costs are kept down by using cutting edge whose slope can be changed to meet soil conditions; jacking operation and cutting edge adjustment are described.
Jacking method was chosen to make street under-crossings in Renton, Wash, sewer line project; costs are kept down by using cutting edge whose slope can be changed to meet soil conditions; jacking operation and cutting edge adjustment are described.
Adjustable cutting edge simplifies jacking large diameter concrete pipe
Western Construction
Unrue, J. (author)
Western Construction ; 38
1963
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Pipe jacking operation of large diameter pipe from open caissons
Engineering Index Backfile | 1962
|Engineering Index Backfile | 1955
|Construction method for penetrating large-pipe-diameter jacking pipe through sea wall
European Patent Office | 2021
|British Library Conference Proceedings | 2008
|