A platform for research: civil engineering, architecture and urbanism
Ultimate strength method cuts snow shed cost
Prestressed design of snow shed built in Rogers Pass, Montreal; except for footing and retaining wall, all members were proportioned by ultimate strength design according to special modified formula; loading design data on relative effect of snow load and moving load of avalanche; backfill slope of 1:5 above shed allows avalanche and rocks to slide safely over top; special positive anchoring devices necessary between roof beams and retaining walls.
Ultimate strength method cuts snow shed cost
Prestressed design of snow shed built in Rogers Pass, Montreal; except for footing and retaining wall, all members were proportioned by ultimate strength design according to special modified formula; loading design data on relative effect of snow load and moving load of avalanche; backfill slope of 1:5 above shed allows avalanche and rocks to slide safely over top; special positive anchoring devices necessary between roof beams and retaining walls.
Ultimate strength method cuts snow shed cost
Eng Contract Rec
Foures, G.H. (author)
1963
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1895
Wind and snow prevention shed tunnel construction method
European Patent Office | 2020
|Snow blocking device assembly and material shed roof snow blocking system
European Patent Office | 2023
|Arched shed structure ice and snow removing method based on inhaul cables
European Patent Office | 2024
|Arched shed structure ice and snow removing method based on resonance effect
European Patent Office | 2024
|