A platform for research: civil engineering, architecture and urbanism
Erecting a large dome without falsework
Illustrates methods used in erecting the dome of the Cathedral of St. John the Divine, New York City. (2500 w.) (No. 9140)
Erecting a large dome without falsework
Illustrates methods used in erecting the dome of the Cathedral of St. John the Divine, New York City. (2500 w.) (No. 9140)
Erecting a large dome without falsework
Eng Rec
1909
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Erecting a 750 ft. steel arch without falsework
Engineering Index Backfile | 1931
|Erecting a bridge on a high falsework tower
Engineering Index Backfile | 1910
Erecting the Springfield bridge on semi-suspended falsework
Engineering Index Backfile | 1908
Falsework for construction of 104-ft. Dome
Engineering Index Backfile | 1929
|Dome cost halved by design permitting movable falsework
Engineering Index Backfile | 1956