A platform for research: civil engineering, architecture and urbanism
Lookout Point Dam on Willamette river, Ore, 256 ft high, will contain 7.8 million cu yd of earth fill; 20,000 cu yd of fill are being poured every 16 hr; fill material comes from borrow pits in reservoir area; there are also 850,000 cu yd of concrete in spillway and powerhouse intake structures; dam will store 456,000 acre ft which will serve power development and flood control.
Lookout Point Dam on Willamette river, Ore, 256 ft high, will contain 7.8 million cu yd of earth fill; 20,000 cu yd of fill are being poured every 16 hr; fill material comes from borrow pits in reservoir area; there are also 850,000 cu yd of concrete in spillway and powerhouse intake structures; dam will store 456,000 acre ft which will serve power development and flood control.
Highball dirt at Lookout Point
Excavating Engr
Day, R. (author)
Excavating Engineer ; 46
1952
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Soils design, construction and performance observations, lookout Point dam, Oregon
Engineering Index Backfile | 1959
|DESIGN REVIEW Timber lookout tower
British Library Online Contents | 2003
|Hong kong, jardine's lookout flat
Online Contents | 2012
|Recent developments in lookout tower practice
Engineering Index Backfile | 1941
|