A platform for research: civil engineering, architecture and urbanism
Bear Creek dam, part of Nantahala Power and Light Co's development of East Fork of Tuckaseggee River, will have crest length of 765 ft and maximum thickness of 760 ft at base and 25 ft at top; its 13,000 hp turbine operating under 230 ft head will drive 10,000 kva generator; dam-building procedure including drilling and blasting; list of dam building equipment.
Bear Creek dam, part of Nantahala Power and Light Co's development of East Fork of Tuckaseggee River, will have crest length of 765 ft and maximum thickness of 760 ft at base and 25 ft at top; its 13,000 hp turbine operating under 230 ft head will drive 10,000 kva generator; dam-building procedure including drilling and blasting; list of dam building equipment.
Here's one way to build rock-fill dam
Construction Methods Equipment
Perez, H.T. (author)
1953
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Unique method used to build Rock-fill dam
Engineering Index Backfile | 1916
|Engineering Index Backfile | 1949
|Engineering Index Backfile | 1951
|Engineering Index Backfile | 1930
|Engineering Index Backfile | 1937
|