A platform for research: civil engineering, architecture and urbanism
Long causeway rebuilt under traffic
Traffic lights are part of construction equipment plant in rebuilding of 1 1/2 mi causeway at Edenton, NC; with traffic directed to single lane on half of old structure, building of half-width of new 26-ft roadway could be carried out; lights at each end of single lane sections were arranged for manual control from towers when traffic was heavy, or they could be switched to automatic timing when traffic was light.
Long causeway rebuilt under traffic
Traffic lights are part of construction equipment plant in rebuilding of 1 1/2 mi causeway at Edenton, NC; with traffic directed to single lane on half of old structure, building of half-width of new 26-ft roadway could be carried out; lights at each end of single lane sections were arranged for manual control from towers when traffic was heavy, or they could be switched to automatic timing when traffic was light.
Long causeway rebuilt under traffic
Construction Methods Equipment
1953
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Suspension bridge rebuilt under traffic
Engineering Index Backfile | 1939
Engineering Index Backfile | 1945
Engineering Index Backfile | 1909
|Engineering Index Backfile | 1923
Engineering Index Backfile | 1912
|