A platform for research: civil engineering, architecture and urbanism
Improvements to Suez Canal
Dredging and deepening operations in progress will extend present handling of 24-ft draft to permit passage of vessels with 36-ft draft for entire length of Canal; mooring basins are being widened and deepened, and separate harbor for fishing boats using Canal is under construction at Port Said; requirements for Canal pilots are given.
Improvements to Suez Canal
Dredging and deepening operations in progress will extend present handling of 24-ft draft to permit passage of vessels with 36-ft draft for entire length of Canal; mooring basins are being widened and deepened, and separate harbor for fishing boats using Canal is under construction at Port Said; requirements for Canal pilots are given.
Improvements to Suez Canal
Naut Gaz
Nautical Gazette ; 147
1953
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1955
Recent improvements on Suez Canal
Engineering Index Backfile | 1956
|The Suez canal and its improvements
Engineering Index Backfile | 1903
Recent and future improvements of Suez Canal
Engineering Index Backfile | 1950
|Engineering Index Backfile | 1888