A platform for research: civil engineering, architecture and urbanism
Substructure of Burdekin high level bridge completed
Structure, combined roadway and railway bridge, consists of ten 250-ft steel truss spans carried on eleven reinforced concrete caissons, three 60-ft and eight 45-ft viaduct spans, and 4-ft walkway; length of bridge between abutments will be 3619.4 ft; each river caisson was sealed by tremie concrete plug 7 ft thick placed 95 ft under water.
Substructure of Burdekin high level bridge completed
Structure, combined roadway and railway bridge, consists of ten 250-ft steel truss spans carried on eleven reinforced concrete caissons, three 60-ft and eight 45-ft viaduct spans, and 4-ft walkway; length of bridge between abutments will be 3619.4 ft; each river caisson was sealed by tremie concrete plug 7 ft thick placed 95 ft under water.
Substructure of Burdekin high level bridge completed
Commonwealth Engr
1953
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Burdekin bridge superstructure
Engineering Index Backfile | 1958
|High strength bolt field connections at Burdekin bridge
Engineering Index Backfile | 1957
|Refurbishment of Burdekin River Bridge
British Library Online Contents | 1993
|Modeling the Mighty Burdekin River in Flood
British Library Conference Proceedings | 1998
|Engineering Index Backfile | 1937
|