A platform for research: civil engineering, architecture and urbanism
Reconstruction of bridge over Rhine River
Design requirements for competitive bids; three spans of steel box girders, 103, 206, and 103 m in length; reinforced concrete floor; two road lanes, 7.75 m each, 6.17 m lane for double track street railroad and two sidewalks, 4.31 m each; static calculation; repair of old steel structure and piers damaged during war.
Reconstruction of bridge over Rhine River
Design requirements for competitive bids; three spans of steel box girders, 103, 206, and 103 m in length; reinforced concrete floor; two road lanes, 7.75 m each, 6.17 m lane for double track street railroad and two sidewalks, 4.31 m each; static calculation; repair of old steel structure and piers damaged during war.
Reconstruction of bridge over Rhine River
Wiederaufbau der Rheinbruecke Duesseldorf-Neuss
Schaechterle, K. (author) / Wintergerst, L. (author)
Bauingenieur ; 27
1952
19 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Conference Proceedings | 2002
|British Library Conference Proceedings | 2002
|Reconstruction of bombed bridge over Rhine river at Wesel, Germany
Engineering Index Backfile | 1954
|Reconstruction of road bridge over Rhine
Engineering Index Backfile | 1956
|Bridge at Roppenheim over Rhine River
Engineering Index Backfile | 1950
|