A platform for research: civil engineering, architecture and urbanism
Stress measurements on San Leandro creek bridge
Techniques for performing large scale investigations of actual and design stresses of highway bridge developed at Institute of Traffic and Transportation Eng of Univ of California; design and installation of instrumentation used in obtaining basic records; methods of reducing these records and difficulties encountered in obtaining reliable data. (Separate)
Stress measurements on San Leandro creek bridge
Techniques for performing large scale investigations of actual and design stresses of highway bridge developed at Institute of Traffic and Transportation Eng of Univ of California; design and installation of instrumentation used in obtaining basic records; methods of reducing these records and difficulties encountered in obtaining reliable data. (Separate)
Stress measurements on San Leandro creek bridge
Am Soc Civ Engrs -- Proc
Clough, R.W. (author) / Scheffey, C.F. (author)
1953
22 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Stress Measurements, San Leandro Creek Bridge
ASCE | 2021
|The 80-ft. Concrete-arch bridge over the San Leandro Creek, San Leandro, Cal.
Engineering Index Backfile | 1903
|art - Installations - Leandro Erlich
Online Contents | 2007
Leandro Valencia Locsin : filipino architect
UB Braunschweig | 2022
|Upper San Leandro water project
Engineering Index Backfile | 1928
|