A platform for research: civil engineering, architecture and urbanism
Continuous girders haunched on top for highway clearance below
Railway bridge of reinforced concrete in Buenos Aires, Argentina, has three continuous spans supported by girders 21-ft high at piers and 6-ft high at midpoint of 145-ft central span; road deck is reinforced concrete slab; deck elevation necessitated haunching girders on their upper edges; bridge is built for curved section of track, three spans of bridge being chords of curve.
Continuous girders haunched on top for highway clearance below
Railway bridge of reinforced concrete in Buenos Aires, Argentina, has three continuous spans supported by girders 21-ft high at piers and 6-ft high at midpoint of 145-ft central span; road deck is reinforced concrete slab; deck elevation necessitated haunching girders on their upper edges; bridge is built for curved section of track, three spans of bridge being chords of curve.
Continuous girders haunched on top for highway clearance below
Eng News-Rec
Engineering News-Record ; 151
1953
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Shear Design of Haunched Concrete Box Girders
British Library Conference Proceedings | 1994
|Experimental and analytical behavior of haunched thin-walled RC girders and box girders
Online Contents | 2009
|Experimental and analytical behavior of haunched thin-walled RC girders and box girders
Online Contents | 2009
|Shear design of haunched concrete box girders of the Confederation Bridge
British Library Online Contents | 1997
|