Swing span bridge converted to fixed span
Conversion of 228-ft double track, short swing span by Chicago, South Shore and South Bend to fixed, higher structure; four 500-ton jacks used to lift 660-ton span in three 2-ft stages; prefabricated structural steel blocking was bolted in position between drum girder and loading girders; raising, reinforcement of span, and laying of track on previously constructed approach trestle was completed in total of six days. (see also Ry Track and Structures v 49 n 2 Feb 1953 p 146-9)
Swing span bridge converted to fixed span
Conversion of 228-ft double track, short swing span by Chicago, South Shore and South Bend to fixed, higher structure; four 500-ton jacks used to lift 660-ton span in three 2-ft stages; prefabricated structural steel blocking was bolted in position between drum girder and loading girders; raising, reinforcement of span, and laying of track on previously constructed approach trestle was completed in total of six days. (see also Ry Track and Structures v 49 n 2 Feb 1953 p 146-9)
Swing span bridge converted to fixed span
Ry Age
Railway Age ; 134
1953
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Swing span bridge converted to fixed span
Engineering Index Backfile | 1953
Cantilever supports for a swing span bridge
Engineering Index Backfile | 1892
New double swing-span bridge over Suez Canal
Engineering Index Backfile | 1954
|Record swing span characterizes south capitol street bridge
Engineering Index Backfile | 1951
|Span-by-Span Bridge Construction
Online Contents | 2004
|