A platform for research: civil engineering, architecture and urbanism
Stability of rubble-mound breakwaters
Investigation conducted in 5×18×119-ft concrete flume; models to scales of 1:30, 1:45, and 1:60 were used; test results; accuracy of formulas for design of rubble mound breakwaters; most important findings concerned use of Iribarren's formula.
Stability of rubble-mound breakwaters
Investigation conducted in 5×18×119-ft concrete flume; models to scales of 1:30, 1:45, and 1:60 were used; test results; accuracy of formulas for design of rubble mound breakwaters; most important findings concerned use of Iribarren's formula.
Stability of rubble-mound breakwaters
US Waterways Experiment Station -- Tech Memo
1953
66 pages
44 Supp Plates, 11 p Appendices
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Toe Stability of Rubble Mound Breakwaters
ASCE | 1997
|Toe Stability of Rubble Mound Breakwaters
British Library Conference Proceedings | 1997
|Researches on stability of rubble-mound breakwaters
UB Braunschweig | 1978
|Design of rubble mound breakwaters
Engineering Index Backfile | 1963
|Tetrapod armor stability of rubble mound breakwaters
Engineering Index Backfile | 1969
|