A platform for research: civil engineering, architecture and urbanism
Magnitude of work involved at London airport; earthwork; types of earth moving plant; methods for compaction of gravel subbase; four different types of major concrete mixing plant; stormwater drainage systems; testing and control of materials; site organization including machinery; welfare and labor relations. (See also - discussion p 31-41, 2 Supp plates)
Magnitude of work involved at London airport; earthwork; types of earth moving plant; methods for compaction of gravel subbase; four different types of major concrete mixing plant; stormwater drainage systems; testing and control of materials; site organization including machinery; welfare and labor relations. (See also - discussion p 31-41, 2 Supp plates)
Organization of airport construction
Instn Civ Engrs -- Proc
Palmer, E.A. (author)
1953
30 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Airport construction and maintenance
Engineering Index Backfile | 1930
|Airport design and construction
Engineering Index Backfile | 1929
|Airport construction and maintenance
Engineering Index Backfile | 1930
|Construction of Yarmouth Airport
Engineering Index Backfile | 1945
|