A platform for research: civil engineering, architecture and urbanism
New runway for Newark airport
Heavy duty pavement, designed to resist subsidence; use of vertical sand drains expedite stabilization; repairs and strengthening of existing pavement and addition of 7000×200 ft taxiway; since runway is only 10 1/2 ft above datum, drainage with 40,000 ft of plain or perforated corrugated metal pipe of 6 or 8-in. diam was provided; test runway led to pavement of 6-in. compacted subbase, 5-in. macadam, 2-in. asphaltic concrete course, and 1 1\2 in. asphaltic concrete surface course.
New runway for Newark airport
Heavy duty pavement, designed to resist subsidence; use of vertical sand drains expedite stabilization; repairs and strengthening of existing pavement and addition of 7000×200 ft taxiway; since runway is only 10 1/2 ft above datum, drainage with 40,000 ft of plain or perforated corrugated metal pipe of 6 or 8-in. diam was provided; test runway led to pavement of 6-in. compacted subbase, 5-in. macadam, 2-in. asphaltic concrete course, and 1 1\2 in. asphaltic concrete surface course.
New runway for Newark airport
Roads Streets
Roads and Streets ; 96
1953
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
NEWARK AIRPORT - Runway resurfacing report.
Online Contents | 1997
Newark Airport Runway: A Forensic Study Revisited
British Library Online Contents | 2013
|Heavy duty runway for Newark airport founded on tidal marsh
Engineering Index Backfile | 1953
British Library Conference Proceedings | 2000
|