A platform for research: civil engineering, architecture and urbanism
Pile foundation developed in France by removing soil from large diameter (3 to 5 ft) tubes, later filled with reinforced concrete and then generally withdrawn; method known as Benoto system, comprises patented hammer grabs operating inside tube; method is particularly suitable when loads are very heavy; at Corbusier apartment building, Marseilles, each pile is loaded with 666 tons.
Pile foundation developed in France by removing soil from large diameter (3 to 5 ft) tubes, later filled with reinforced concrete and then generally withdrawn; method known as Benoto system, comprises patented hammer grabs operating inside tube; method is particularly suitable when loads are very heavy; at Corbusier apartment building, Marseilles, each pile is loaded with 666 tons.
Large-diameter piles
Concrete Constr Eng
Hunter, L.E. (author)
1954
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
TIBKAT | 1990
|Engineering Index Backfile | 1961
|Going underground: Tactical large diameter piles
British Library Online Contents | 2008
Going underground - Tactical large diameter piles
Online Contents | 2008