A platform for research: civil engineering, architecture and urbanism
$500,000 saved by attaching four transmission towers to James River Bridge's main channel crossing; all steel river towers were designed with three sides instead of customary four; foundations for towers consist of three steel H piles under each of three legs; protection was achieved by fendering with ring of steel piles.
$500,000 saved by attaching four transmission towers to James River Bridge's main channel crossing; all steel river towers were designed with three sides instead of customary four; foundations for towers consist of three steel H piles under each of three legs; protection was achieved by fendering with ring of steel piles.
Power line leaps James river
Eng News-Rec
Furlong, H.W. (author)
Engineering News-Record ; 152
1954
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2000
|Distributor leaps up technology ladder
British Library Online Contents | 2003
Redmond Leaps Into The Kids' Market
British Library Online Contents | 1999
Public Consultation in Local Environment Agency Plans (LEAPS)
Online Contents | 2000
|Public Consultation in Local Environment Agency Plans (LEAPS)
Taylor & Francis Verlag | 2000
|