A platform for research: civil engineering, architecture and urbanism
Concrete quality control at Woodhead new tunnel
Factors which influenced mix design for tunnel at Woodhead between Manchester and Sheffield, England; batching, transporting, and placing arrangements; sampling and testing scheme; results analyzed; importance of elasticity in specifying mixes.
Concrete quality control at Woodhead new tunnel
Factors which influenced mix design for tunnel at Woodhead between Manchester and Sheffield, England; batching, transporting, and placing arrangements; sampling and testing scheme; results analyzed; importance of elasticity in specifying mixes.
Concrete quality control at Woodhead new tunnel
Instn Civ Engrs -- Proc
Sharman, F.A. (author)
1954
15 pages
2 Supp plates
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Progress with new woodhead tunnel
Engineering Index Backfile | 1951
Progress with new woodhead tunnel
Engineering Index Backfile | 1951
Progress with new woodhead tunnel
Engineering Index Backfile | 1951
Discussion of “Woodhead on Concrete Movement”
ASCE | 2021
|Woodhead new tunnel: Construction of three-mile main double-line railway tunnel
Engineering Index Backfile | 1954
|