A platform for research: civil engineering, architecture and urbanism
When placing girder spans [midline ellipsis] Old trestle used as falsework
Methods used by Central of Georgia for replacing 5-pile open deck railroad trestle carrying main line between Columbus, Ga, and Americus, with 5-span steel girder and concrete bridge; old trestle was used as falsework for placing spans which had been prefabricated out of steel salvaged from retirement of other structures.
When placing girder spans [midline ellipsis] Old trestle used as falsework
Methods used by Central of Georgia for replacing 5-pile open deck railroad trestle carrying main line between Columbus, Ga, and Americus, with 5-span steel girder and concrete bridge; old trestle was used as falsework for placing spans which had been prefabricated out of steel salvaged from retirement of other structures.
When placing girder spans [midline ellipsis] Old trestle used as falsework
Ry Track Structures
Benson, G.W. (author)
1954
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
No train delays when [midline ellipsis] C and NW replaces old truss spans
Engineering Index Backfile | 1954
|The design of girder and truss spans and trestle work in structural steel
Engineering Index Backfile | 1912
Four miles of bridge spans erected without falsework
Engineering Index Backfile | 1951
Weather [midline ellipsis] waves [midline ellipsis] and offshore oil
Engineering Index Backfile | 1957
|Roadbuilding [midline ellipsis] 1939 accomplishments [midline ellipsis] 1940 budgets and outlook
Engineering Index Backfile | 1940