A platform for research: civil engineering, architecture and urbanism
Methods used in construction of bridges for Rock Island's Atlantic cutoff; steel spans were trucked in and erected with crawler equipment, permitting track laying to be carried across bridge openings without interruption; cutoff is single track line, 46.33 mi long, between Atlantic, Iowa, and Council Bluffs.
Methods used in construction of bridges for Rock Island's Atlantic cutoff; steel spans were trucked in and erected with crawler equipment, permitting track laying to be carried across bridge openings without interruption; cutoff is single track line, 46.33 mi long, between Atlantic, Iowa, and Council Bluffs.
Bridges built ahead of track
Ry Age
Marsh, J.F. (author)
Railway Age ; 136
1954
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Portable railway bridges precision built
Engineering Index Backfile | 1944
|Concrete bridges built in cantilever
Engineering Index Backfile | 1964
|Wiley | 2018
|Bridges built fast on New Turnpike
Engineering Index Backfile | 1957
|Brick-built bridges make a comeback.
Online Contents | 1994