A platform for research: civil engineering, architecture and urbanism
Straightening of pillar and arch of railroad bridge over Ruhr River at Herdecke, Germany
Total length 313 m; bridge consists of 12 masonry arches of 20 m clear span; blasts and flood caused collapse of two adjacent arches; piers which were subjected to unilateral pressure assumed inclined position; suggestions for remedies.
Straightening of pillar and arch of railroad bridge over Ruhr River at Herdecke, Germany
Total length 313 m; bridge consists of 12 masonry arches of 20 m clear span; blasts and flood caused collapse of two adjacent arches; piers which were subjected to unilateral pressure assumed inclined position; suggestions for remedies.
Straightening of pillar and arch of railroad bridge over Ruhr River at Herdecke, Germany
Geraderichten eines l\ill\feilers und eines Gewoelbes am Eisenbahnviadukt ueber die Ruhr bei Herdecke
Zucker, O. (author)
Bautechnik ; 30
1953
7 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Prestressed highway bridge over Ruhr river at Frondenberg, Germany
Engineering Index Backfile | 1954
|Le nouveau pont pres de Herdecke sur la Ruhr (Allemagne)
Engineering Index Backfile | 1952
|Engineering Index Backfile | 1952
|Railroad bascule bridge over Hunte (river) in Oldenburg, (Germany)
Engineering Index Backfile | 1961
|