A platform for research: civil engineering, architecture and urbanism
Barrow's jubilee bridge made fully automatic
Jubilee Bridge which spans Walney Channel has total length of 1100 ft, divided into eight fixed spans from 82 to 117 ft spans and opening span of 120 ft; two leaves of this span operate on Scherzer rolling lift system; each leaf powered by 25-hp d-c motor; operation and control.
Barrow's jubilee bridge made fully automatic
Jubilee Bridge which spans Walney Channel has total length of 1100 ft, divided into eight fixed spans from 82 to 117 ft spans and opening span of 120 ft; two leaves of this span operate on Scherzer rolling lift system; each leaf powered by 25-hp d-c motor; operation and control.
Barrow's jubilee bridge made fully automatic
Civ Structural Engrs Rev
1954
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Protecting Silver Jubilee Bridge
British Library Online Contents | 2011
|Victoria jubilee bridge protection
Engineering Index Backfile | 1915
|Characteristics of nest cavities of Barrow's Goldeneyes in eastern Canada
British Library Online Contents | 2010
|London Bridge Station, Jubilee Line Extension
British Library Conference Proceedings | 1997
|The Maintenance of Silver Jubilee Bridge, UK
TIBKAT | 2020
|