A platform for research: civil engineering, architecture and urbanism
Construction of new Lombard bridge in Hamburg, Germany
Prestressed frame has span of 60.32 m; useful width 26 m is subdivided into 4-lane road, 2 bicycle paths, and sidewalks; data on prestressing and execution of work.
Construction of new Lombard bridge in Hamburg, Germany
Prestressed frame has span of 60.32 m; useful width 26 m is subdivided into 4-lane road, 2 bicycle paths, and sidewalks; data on prestressing and execution of work.
Construction of new Lombard bridge in Hamburg, Germany
Vom Bau der Neuen Lombardsbruecke in Hamburg
Havemann, K. (author) / Suelz, F. (author)
1953
6 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Lombard bridge in Hamburg, Germany
Engineering Index Backfile | 1953
|Blanc-Mesnil College. P. Lombard
Online Contents | 1994
Lombard/Miller House Westby, Wisconsin
British Library Online Contents | 1995
Rudy Ricciotti et Pierre Lombard
British Library Online Contents | 2000