A platform for research: civil engineering, architecture and urbanism
Portishead "B" power station, with particular reference to circulating -- Water works
Building works at Portishead `B' power station situated on Severn Estuary; construction of tunnels for cooling water system is of special interest; system comprised dredged shelf on foreshore and four 9 ft diam tunnels constructed to separate screen shafts of 21 ft diam; from these shafts tunnels run parallel and connect with main pump shafts below condensers; system has been designed to deal with max of 800 cusecs. (See also Instn Civ Engrs -- Proc v 7 Aug 1957 p 775-816 (discussion) 816-26, 6 plates)
Portishead "B" power station, with particular reference to circulating -- Water works
Building works at Portishead `B' power station situated on Severn Estuary; construction of tunnels for cooling water system is of special interest; system comprised dredged shelf on foreshore and four 9 ft diam tunnels constructed to separate screen shafts of 21 ft diam; from these shafts tunnels run parallel and connect with main pump shafts below condensers; system has been designed to deal with max of 800 cusecs. (See also Instn Civ Engrs -- Proc v 7 Aug 1957 p 775-816 (discussion) 816-26, 6 plates)
Portishead "B" power station, with particular reference to circulating -- Water works
Surveyor
Morgan, H.D. (author) / Haswell, C.K. (author) / Sancha, L. (author)
Surveyor ; 116
1957
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Portishead generating station, Bristol
Engineering Index Backfile | 1934
|Portishead "B" power station, with particular reference to circulating -- Water works
Engineering Index Backfile | 1957
|New services planned - Reopening plans at Portishead and elsewhere
Online Contents | 2010
Screw-piling, with particular reference to screwpiled sewage sea outfall works
Engineering Index Backfile | 1930
|Screw-piling, with particular reference to screw-piled sewage sea outfall works
Engineering Index Backfile | 1930
|