A platform for research: civil engineering, architecture and urbanism
Construction of Shepaug Hydro-Electric Project on Housatonic River in Connecticut
Account covers site data, construction of concrete dam, spillway, water passages, switchyard and electric equipment, etc; installed capacity will be 86,000 kw; reservoir will have surface area of 1870 acres; power house with concrete substructure is of structural steel framing, finished in red face brick; data on plant equipment; tables show concrete mixes, placement, cement data, etc.
Construction of Shepaug Hydro-Electric Project on Housatonic River in Connecticut
Account covers site data, construction of concrete dam, spillway, water passages, switchyard and electric equipment, etc; installed capacity will be 86,000 kw; reservoir will have surface area of 1870 acres; power house with concrete substructure is of structural steel framing, finished in red face brick; data on plant equipment; tables show concrete mixes, placement, cement data, etc.
Construction of Shepaug Hydro-Electric Project on Housatonic River in Connecticut
Conn Soc Civ Engrs -- Proc
MacWilliam, C.M. (author)
1955
32 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.