A platform for research: civil engineering, architecture and urbanism
Kemano pressure conduit engineering investigations
Basic investigations and tests associated with design of pressure conduits for world's largest underground hydroelectric generating station with ultimate 2,400,000 turbine hp installed capacity in 16 units in British Columbia.
Kemano pressure conduit engineering investigations
Basic investigations and tests associated with design of pressure conduits for world's largest underground hydroelectric generating station with ultimate 2,400,000 turbine hp installed capacity in 16 units in British Columbia.
Kemano pressure conduit engineering investigations
Am Soc Civ Engrs -- Proc (J Power Div)
Lawton, F.L. (author) / Sutherland, J.G. (author)
1957
34 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Kemano Pressure Conduit Engineering Investigations
ASCE | 2021
|Project: Kemano Completion Project
Online Contents | 1994
Nechako-Kemano-Kitimat project
Engineering Index Backfile | 1952
|Kemano tunnel repairs -- Final report
Engineering Index Backfile | 1962
|NORTH AMERICA: Kemano Completion Project: Life after death?
Online Contents | 1997