A platform for research: civil engineering, architecture and urbanism
Most of project has been built in dry; navigation lock, spillway dam, powerhouse, concrete nonoverflow sections, and fish ladders were built on high flood channel on Washington shore; area was inundated only about 4 mo of each year during spring flood season; closure dam is rock and gravel fill, blanketed on upstream side with relatively impervious sandy gravel; structure will be 2000 ft long with max height of 285 ft.
Most of project has been built in dry; navigation lock, spillway dam, powerhouse, concrete nonoverflow sections, and fish ladders were built on high flood channel on Washington shore; area was inundated only about 4 mo of each year during spring flood season; closure dam is rock and gravel fill, blanketed on upstream side with relatively impervious sandy gravel; structure will be 2000 ft long with max height of 285 ft.
Dalles dam closure
Military Eng
Elder, H.B. (author)
Military Engineer ; 49
1957
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Rockfill Dams: Dalles Closure Dam
ASCE | 2021
|UB Braunschweig | 1963
|Commission "Dalles - Planchers-Dalles"
UB Braunschweig | 1960
|Closure to “Pope on Dalles Dam”
ASCE | 2021
|