A platform for research: civil engineering, architecture and urbanism
Tunnel taps mystic lake below water surface
Final blast removes last rock on lake end of bore and water is then drawn down to permit construction of head-works.
Tunnel taps mystic lake below water surface
Final blast removes last rock on lake end of bore and water is then drawn down to permit construction of head-works.
Tunnel taps mystic lake below water surface
Eng News-Rec
1926
2 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Mystic Lake Project No. 2301-Montana
NTIS | 1974
Mystic cable tunnel design and construction
Engineering Index Backfile | 1946
|British Library Conference Proceedings | 1994
|Using the Integrated Licensing Process: Experiences with Mystic Lake
British Library Online Contents | 2007
|Filtration plant of mystic valley water company
Engineering Index Backfile | 1936
|