A platform for research: civil engineering, architecture and urbanism
Reinforced-concrete subway with total length of 4476 ft. is being constructed between Oakland and Alameda, Cal.; 24-ft. roadway and two sidewalks carried in subaqueous tunnel.
Reinforced-concrete subway with total length of 4476 ft. is being constructed between Oakland and Alameda, Cal.; 24-ft. roadway and two sidewalks carried in subaqueous tunnel.
Oakland-Alameda estuary subway
Pub. Works
Geiger, C.W. (author)
Public Works ; 57
1926
5 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Oakland-Alameda estuary tube
Engineering Index Backfile | 1930
|Concrete on the Oakland-Alameda estuary tube
Engineering Index Backfile | 1927
|Engineering Index Backfile | 1928
|Engineering Index Backfile | 1926
|