A platform for research: civil engineering, architecture and urbanism
Widening of 2100 ft. of main business streets, relaying of car tracks, gas and water mains and wire conduits, building retaining walls and bridge, and paving entire area, completed in 82 working days or 95 days elapsed time.
Widening of 2100 ft. of main business streets, relaying of car tracks, gas and water mains and wire conduits, building retaining walls and bridge, and paving entire area, completed in 82 working days or 95 days elapsed time.
Street widening in Syracuse
Pub. Works
Pitts, Jr., N.F. (author)
Public Works ; 57
1926
4 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Street railway evolution in Syracuse
Engineering Index Backfile | 1901
|Liverpool street station widening
Engineering Index Backfile | 1896
Citation: Syracuse Technology Garden, Syracuse, NY
British Library Online Contents | 2007
Engineering Index Backfile | 1903
10,000-ton building side-steps street widening
Engineering Index Backfile | 1940