A platform for research: civil engineering, architecture and urbanism
New playing field for Toronto's International League team, with covered stand of approximately 20,000 capacity; built in 5 winter months; deck formed mostly by pre-cast slabs; ramp system throughout, on 1 to 6 grade.
New playing field for Toronto's International League team, with covered stand of approximately 20,000 capacity; built in 5 winter months; deck formed mostly by pre-cast slabs; ramp system throughout, on 1 to 6 grade.
Toronto baseball and athletic stadium
Can. Engr
Loudon, T.R. (author)
Canadian Engineer ; 50
1926
4 pages
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1997
|Online Contents | 1997
|Online Contents | 1998
Online Contents | 1998
Baseball Stadium in Odate, Japan
British Library Online Contents | 2001