A platform for research: civil engineering, architecture and urbanism
Construction work in general sewer system in St. Paul, comprising 14 miles of various sizes of sewer, maximum being 12-ft. horseshoe section, which is part of $7,000,000 program of relief and trunk-sewer construction.
Construction work in general sewer system in St. Paul, comprising 14 miles of various sizes of sewer, maximum being 12-ft. horseshoe section, which is part of $7,000,000 program of relief and trunk-sewer construction.
Tunnel and timber work in large- sewers
Contractors' Engrs.' Monthly
Shepard, G.M. (author)
1926
5 pages
13 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1894
Setting out and construction of large brick sewers in tunnel
Engineering Index Backfile | 1935
|Two Toronto sewers built on piles and timber bents
Engineering Index Backfile | 1917
|Tunnel and intercepting sewers at North Minneapolis sewage
Engineering Index Backfile | 1891
Engineering Index Backfile | 1912
|