A platform for research: civil engineering, architecture and urbanism
River control at the new St. Louis water-works
Expensive works essential to hold river channel to course in front of plant; brush mattresses and pile dikes effect predicted changes and add 300 acres of new land.
River control at the new St. Louis water-works
Expensive works essential to hold river channel to course in front of plant; brush mattresses and pile dikes effect predicted changes and add 300 acres of new land.
River control at the new St. Louis water-works
Eng. News-Rec
Wall, E.E. (author)
1926
3 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New Missouri River Water Works of Saint Louis
Wiley | 1929
|St. Louis water works extension
Engineering Index Backfile | 1892
To improve St. Louis water works
Engineering Index Backfile | 1913
|Building of St. Louis Water Works extension aqueduct
Engineering Index Backfile | 1892