A platform for research: civil engineering, architecture and urbanism
Design and construction of pier "BC," Canadian pacific railway, at Vancouver
Concrete substructure; upper deck for passengers; soft mud at side replaced by 1,373,000 cu. yd. of sand and gravel into which piles were driven by 17-ton hammer aided by jets.
Design and construction of pier "BC," Canadian pacific railway, at Vancouver
Concrete substructure; upper deck for passengers; soft mud at side replaced by 1,373,000 cu. yd. of sand and gravel into which piles were driven by 17-ton hammer aided by jets.
Design and construction of pier "BC," Canadian pacific railway, at Vancouver
Eng. News-Rec
Wilder, A.D. (author)
1926
6 pages
10 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of the Ballantyne pier Vancouver
Engineering Index Backfile | 1924
|Canadian pacific terminal improvements at Vancouver
Engineering Index Backfile | 1915
Difficulties in connection with pier construction for Vancouver bridge
Engineering Index Backfile | 1934
Ballantyne Pier Redevelopment Project, Vancouver
British Library Conference Proceedings | 1995
|ASCE | 2021
|