A platform for research: civil engineering, architecture and urbanism
$7,000,000 power project completed in Kentucky
Dix River dam has height of 22-story office building and is over 1000 ft. long; tunnel, 24 ft. in diameter, used to divert river water while construction proceeded; 1,800,000 cu. yds. of rock handled; annual capacity of 77,000,000 kw.-hr. contracted for.
$7,000,000 power project completed in Kentucky
Dix River dam has height of 22-story office building and is over 1000 ft. long; tunnel, 24 ft. in diameter, used to divert river water while construction proceeded; 1,800,000 cu. yds. of rock handled; annual capacity of 77,000,000 kw.-hr. contracted for.
$7,000,000 power project completed in Kentucky
Mfrs.' Rec
MacMurphy, D. (author)
1926
3 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Baker river power project completed
Engineering Index Backfile | 1925
|British Library Online Contents | 2001
Engineering Index Backfile | 1951
Engineering Index Backfile | 1941
|Mbashe North project nearly completed
British Library Online Contents | 2008