A platform for research: civil engineering, architecture and urbanism
The construction of the new entrance to tranmere dock
Construction of new entrance, 140 ft. in width, to Cammell Laird and Co.'s wet dock at Birkenhead; work involved construction and removal of temporary concrete cofferdam, construction of new entrance for sliding caisson, and removal of existing river wall. (Abstract.) Paper read before Instn. Civ. Engrs.
The construction of the new entrance to tranmere dock
Construction of new entrance, 140 ft. in width, to Cammell Laird and Co.'s wet dock at Birkenhead; work involved construction and removal of temporary concrete cofferdam, construction of new entrance for sliding caisson, and removal of existing river wall. (Abstract.) Paper read before Instn. Civ. Engrs.
The construction of the new entrance to tranmere dock
Engineering
Bertlin, P.W. (author)
Engineering ; 121
1926
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Dock-entrance reconstruction works
Engineering Index Backfile | 1929
Design and construction of the new dock entrance
British Library Conference Proceedings | 1994
|Dry dock entrance structure with dock gate leakage test function and construction method
European Patent Office | 2024
|The construction of the new entrance to tranmere dock
Engineering Index Backfile | 1925
|Dry dock entrance prefabrication and installation method
European Patent Office | 2024
|