A platform for research: civil engineering, architecture and urbanism
Bridging the Delaware River at Philadelphia
Problems involved; rapid construction results in opening bridge before predicted day; three grades of steel used in superstructure; choice of loading; features of design calculations; tests made to verify design; construction of towers, cable spinning and suspended structures. (See also - no. 14 Sept. 30 1926 pp. 530-535)
Bridging the Delaware River at Philadelphia
Problems involved; rapid construction results in opening bridge before predicted day; three grades of steel used in superstructure; choice of loading; features of design calculations; tests made to verify design; construction of towers, cable spinning and suspended structures. (See also - no. 14 Sept. 30 1926 pp. 530-535)
Bridging the Delaware River at Philadelphia
Eng. News-Rec
1926
7 pages
18 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Delaware River bridge at Philadelphia
Engineering Index Backfile | 1926
|The Delaware river bridge between Philadelphia and Camden
Engineering Index Backfile | 1927
|The Delaware river from Philadelphia to the sea
Engineering Index Backfile | 1927
|The Delaware River from Philadelphia to the Sea
ASCE | 2021
|The Delaware river from Philadelphia to the sea
Engineering Index Backfile | 1928
|