A platform for research: civil engineering, architecture and urbanism
Describes widening of bridge without interruption of traffic; this was effected by adding new main booms (arched girders without tension member) alongside existing ones, new roadway for street-car lines and sidewalks being suspended from new booms; old main booms still support former roadway forming center of bridge. (See also description by Mangold in Eng. Progress, vol. 7, no. 10, Oct. 1926, pp. 264-265, 3 figs)
Describes widening of bridge without interruption of traffic; this was effected by adding new main booms (arched girders without tension member) alongside existing ones, new roadway for street-car lines and sidewalks being suspended from new booms; old main booms still support former roadway forming center of bridge. (See also description by Mangold in Eng. Progress, vol. 7, no. 10, Oct. 1926, pp. 264-265, 3 figs)
The reconstruction of the Duesseldorf highway bridge
Die Verbreiterung der Rheinbrucke in Du sseldorf
Daub, R. (author)
Bauingenieur ; 7
1926
15 pages
35 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
The reconstruction of the duesseldorf highway bridge
Engineering Index Backfile | 1926
|Aluminum bridge at Duesseldorf
Engineering Index Backfile | 1954
|Engineering Index Backfile | 1958
|Juelicherstrasse bridge at Duesseldorf (Germany)
Engineering Index Backfile | 1967
Juelicher Street Bridge in Duesseldorf
Engineering Index Backfile | 1964
|